Project: wstoelting   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Wade Stoelting   -  
Project:   Just - Highlander   -   VIEW REPORTS
Total Hours:799.9
Total Flight Time:
Total Expense:$70783.69
Start/Last Date:Oct 09, 2019 - No Finish Date
Engine:Yamaha Apex
 
Friendly URL: https://eaabuilderslog.org?s=wstoelting

Home or Last Project Picture

Nov 24, 2020     Left Wing Flap - (1.5 hours)       Category: Wings
Clamped left flap and aileron together with 1/4 inch spacer. Centered both surfaces with wing, marked centerline of wing ribs 1,2,4,5,7,9 onto front spars. Centered and clamped hinges and bell crank on flap with markings. Secured with hose clamps. Set position of hinge points with measurements from trailing edge. Located flap to wing to confirm alignment. Transfer drilled #30 holes from brackets to spar. Removed hose clamps to access other holes to transfer. Cleco in place and drilled remaining holes. Mixed up epoxy, solvent cleaned surfaces, applied epoxy and riveted flap hinges and bell crank in place.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.